Hebei Zexu Pipe Manufacturing Co., Ltd.

Hebei Zexu Pipe Manufacturing Co., Ltd.

Manufacturer from China
Active Member
3 Years
Home / Products / Steam Blowing Target Plate /

Pipeline Purge Test Iron Steam Blowing Target Plate Bolting Connection

Contact Now
Hebei Zexu Pipe Manufacturing Co., Ltd.
Province/State:hebei
Country/Region:china
Contact Person:MissZhao
Contact Now

Pipeline Purge Test Iron Steam Blowing Target Plate Bolting Connection

Ask Latest Price
Video Channel
Brand Name :ZeXu
Model Number :Drawing processing
Place of Origin :Yanshan, Hebei, China
MOQ :30pcs
Price :$5pcs
Payment Terms :T/T
Supply Ability :200 pieces per day
Delivery Time :5-7 working days
Packaging Details :Each individual flexible packing, external wooden case packing
Material :Aluminum, carbon steel, copper
Purpose :Pipeline purge test
Shape :Long rectangular cuboid
Nickname (s) :Purge target plate, sputter target plate
Connection mode :bolting
Surface description :Finish, mirror
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Pipe Steam Purge Aluminum Target Plate Mirror Iron Target Plate

1. Purpose

The purpose of this procedure is to provide the commissioning procedure for boiler steam blowing.

The boiler steam blowing is to remove deposited debris such as sand, welding dregs, rust etc. inside SH tube, RH tube and other steam pipe while manufacturing, transporting, storing and erecting.

pipe →temporary pipe → target plat →temporary pipe → atmosphere.

Other disposal and requirement for temporary pipe of steam blowing

1) All temporary pipelines before target plate should be based by argon arc weld, be treated by sandblast before installation and be carried out inner cleaning, finally accepted.

2) The temporary valves should be controlled at central control room.

3) The temporary pipe must be hanged and supported reliably and permit thermal expansion.

4) The temporary pipe must be insulated.

5) Drainage pipe and valves must be installed at each lowest point.

6) Disconnect the drainage pipes from main steam, RH steam, and HP/LP bypass to flash tank, and install temporary pipes to drain.

7) Mechanically purge the pipes which are not blown.

Avoid second pollution during the system restoring.

Trial steam blowing :

open temporary valves when drum pressure at

respectively

close temporary valves when drum pressure atrespectively
2.0~2.2 MPa 1.4 MPa
3.0~3.3 MPa 2.0 MPa
4.0~4.4 MPa 3.0 MPa

Pipeline Purge Test Iron Steam Blowing Target Plate Bolting ConnectionPipeline Purge Test Iron Steam Blowing Target Plate Bolting ConnectionPipeline Purge Test Iron Steam Blowing Target Plate Bolting ConnectionPipeline Purge Test Iron Steam Blowing Target Plate Bolting ConnectionPipeline Purge Test Iron Steam Blowing Target Plate Bolting Connection