High Pressure 12Cr1MoV Alloy Boiler Collector For Steam Purging

Ask Latest Price
Video Channel
Brand Name :ZeXu
Model Number :DN100-DN2000
Place of Origin :Yanshan, Hebei, China
MOQ :1PCS
Price :$100 to $500 per unit
Payment Terms :T/T
Supply Ability :40 units per month
Delivery Time :10 working days
Packaging Details :Wooden box, pallet packing
Material :Carbon steel, alloy steel, stainless steel
Stress :0-10MPa
Another name :Slag trap
Scope of application :Applicable to superheater, steam pipe, superheater reheater and other related piping system
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

High Pressure Steam Purging 12Cr1MoV Alloy Pellet Collector Boiler Flush Collector

Particle collector, slag collector Overview:

The pellet collector is also called the slag collector. For the blowing of the steam system of the reheating engine, it is an indispensable work to prevent the turbine blades from being damaged by the debris in the steam system and the rust produced in the pipeline during manufacturing, transportation, storage and construction, which affects the safety and economic operation of the machine.

The blowing of steam system is usually carried out in stages, in order to prevent the dirt in the superheater system from blowing into the reheater, blowing the superheater system. After the superheater system is blown and qualified, the superheater system is connected with the reheater system when the furnace is stopped, and then the superheater and the reheater system are blown in series. According to the requirements of the Technical Code for Electric Power Construction and Acceptance, steam flushing pipe must be required at the machine start-up to ensure the safe operation of the turbine equipment. After the temporary blowpipe control door is installed, the pellet collector and slag collector are installed, and the industrial garbage in the pipeline is discharged from the sewage part, so that the industrial garbage can be avoided into the phase relationship flow.

Pellet collector, slag collector manufacturing standards:
a) Made according to "Steel pressure Vessel Standard"
b) According to GB12349-94 standard and DCT5047-95 regulation of Technical Specification for Electric Power Construction and Acceptance
c) According to the "fire motor starting steam blowpipe manual" 1998 edition
d) Welding process according to Welding Process Evaluation
e) According to the "Thermal Power Project Adjustment Test and Evaluation Standards"
f) According to DT/L852-2004 "Boiler starting and commissioning manual".

High Pressure 12Cr1MoV Alloy Boiler Collector For Steam PurgingHigh Pressure 12Cr1MoV Alloy Boiler Collector For Steam PurgingHigh Pressure 12Cr1MoV Alloy Boiler Collector For Steam PurgingHigh Pressure 12Cr1MoV Alloy Boiler Collector For Steam Purging